Post-Concession Renovation and Upgrade — Tabatinga International Airport
Dedicated technical team for the renovation and upgrade works of the airport and its apron and runway infrastructure after the concession. Includes verification of compliance with ANAC requirements, preparation of complementary designs and follow-up of the interventions required by the concession contract. Development of designs and simulations for apron expansion and internal road system adjustments, including airport paving, drainage and horizontal and vertical signage in accordance with ICAO and ANAC standards. Master Plan, Basic Aerodrome Protection Zone Plan (PBZPA and PZPANA)